Package Balance Container

Homepage Package Balance Container

 
3K BOMBE PACKAGE BALANCE CONTAINER
3K BOMBE PACKAGE BALANCE CONTAINER 10 BAR 

3K BOMBE PACKAGE BALANCE CONTAINER

MAXIMUM TEMPERATURE TEMPERATURE:

110  C

3K BOMBE PACKAGE BALANCE CONTAINER

CAPACITY AND DIAMETER 

29 KW DN32 4000 KW DN250

3K BOMBE PACKAGE BALANCE CONTAINER

CONNECTION STYLE:

GEAR
PACKAGE BALANCE CONTAINER
WELDING
PACKAGE BALANCE CONTAINER
FLANGED
PACKAGE BALANCE CONTAINER
3K BOMBE PACKAGE BALANCE CONTAINER TECHNICAL DETAILS
KCAL CAPACITY KW DN
CONNECTION
DN1 BODY (MM) FL L
FLANGED CONNECTION(MM)
    KB L WELDED CONNECTION(MM) H (MM) H1 (MM) H2 (MM) A1 A2
25000 KW PACKAGE BALANCE CONTAINER 29 32 76 175 165 350 210 85 1/2" 1/2"
43000 KW PACKAGE BALANCE CONTAINER 50 40 89 210 200 400 240 105 1/2" 1/2"
74000 KW PACKAGE BALANCE CONTAINER 86 50 114 235 225 550 340 125 1/2" 1/2"
93000 KW PACKAGE BALANCE CONTAINER 108 65 140 305 295 630 410 135 1/2" 1"
112.000 KW PACKAGE BALANCE CONTAINER 130 65 165 335 325 720 500 140 1/2" 1"
170.000 KW PACKAGE BALANCE CONTAINER 197 80 219 425 410 900 570 190 1/2" 1"
280.000 KW PACKAGE BALANCE CONTAINER 325 100 219 435 425 1000 720 190 1/2" 1"
450.000 KW PACKAGE BALANCE CONTAINER 523 125 273 555 535 1300 910 235 1/2" 1 1/4"
774.000 KW PACKAGE BALANCE CONTAINER 900 150 320 650 630 1500 1130 260 1/2" 1 1/4"
1.118.000 KW PACKAGE BALANCE CONTAINER 1300 150 350 695 670 1600 1270 290 1/2" 1 1/4"
1.505.000 KW PACKAGE BALANCE CONTAINER 1750 200 400 770 740 1850 1330 350 1/2" 1 1/4"
2.150.000 KW PACKAGE BALANCE CONTAINER 2500 200 450 860 830 2000 1545 370 1/2" 1 1/4"
2.580.000KW PACKAGE BALANCE CONTAINER 3000 200 500 920 880 2200 1660 420 1/2" 1 1/2"
3.010.000 KW PACKAGE BALANCE CONTAINER 3500 250 550 1010 970 2500 1850 470 1/2" 1 1/2"
3.440.000KW PACKAGE BALANCE CONTAINER 4000 250 600 1150 1050 2900 2300 500 1/2" 1 1/2"
NOTE: CONTACT YOUR SPECIAL AND BIG PACKAGE BALANCE CONTAINER REQUIREMENTS 


WHAT IS THE 3K PACKAGE BALANCE CONTAINER?

GAS WITHIN THE DEVELOPMENT OF THE OXYGEN INSTALLATION TEMPERATURE

HOW TO BE STARTED WITH THE WATER IN THE SYSTEM.

It is in the same time and it is regulated in the port and the facility

WHEN CLEANING DOES NOT INCLUDE PARTIAL OR COMPLETENCIES IN THE INSTALLATION, RADIATORS TO MAKE AIR,

UNDERSTANDING RELIABLE VOICE AND CIRCULATORY DISORDERS.

THERMAL LIQUIDS IN THE SAME TIME CONTAINING THE HEAT LOSS WINS

PROBLEMS WHICH WE CAN SEE IN THE INSTALLATIONS AND NOT RECEIVED WHEN THE REQUIRED MEASURE IS TAKEN

AND CAUSES OF THE LIFE OF THE INSTALLATIONS. ACCORDING TO THE STATE OF THE INSTALLATION

3K SPECIAL STAINLESS STEEL SEPARATELY, AIR SEPARATOR, SHEAR SEPARATOR

3K BOMBE WITH 3K BOMBE PACKAGE BALANCE CONTAINER PRODUCED WITH INTERIOR STRUCTURE

USING THE PACKAGE BALANCE CONTAINER PROVIDES YOU INSTALLATION, WORKING AND PLACE ADVANTAGE

3K BOMBE PACKAGE BALANCE CONTAINER EASY TO CLOSE THE SYSTEM WITH DISCHARGE VALVE

YOU CAN DO IT FOR CLEANING AND MAINTENANCE.